Lime Stabilization: 44,478 SqFt Mix 6% of Lime slurry 6\” into the sub-grade. Water and compact.
Foundation
532 LF of Dirt formed concrete grade beam with Spread Footers.
(2) Interior Footers.
2,467 SqFt of concrete SOG.
1,103 SqFt of Concrete SOD.
Asphalt Scope
Install 24,457 SqFt of 3\” Asphalt Paving
Install 15,702 SqFt of 3\” Asphalt Paving
Install 4,316 SqFt of 3\” Asphalt Paving
Concrete Scope
11,865 SqFt of 6\” thick concrete pavement. 111 LF of concrete integral curb.
3,867 SqFt of 4\” thick concrete sidewalk with 2\” of Cushion Sand and (4) BFR.